Alembic Cloud Forest Overview

This overview sets out Alembic Cloud Forest as it stands on the public record as at 16 September 2026 — what is registered and under what name, which company carries the obligation and how it relates to the group whose brand is on the hoarding, who owns the land, what the promoter has registered as the technical specification of the buildings, how far the work and the sales have actually got, what the project's financial standing is, and the dates the promoter is held to. It is the detail behind the summary, and it is written so that a buyer can check every part of it independently before committing money.

What is registered - Cloud Forest

The project is registered as Cloud Forest under PRM/KA/RERA/1251/446/PR/250625/007869, granted by the Karnataka Real Estate Regulatory Authority to Shreno Limited. "Alembic Cloud Forest" is the marketing name and the domain. The register carries the shorter name, and that is not a trivial difference: a search of the register for the marketing name returns nothing. Search the registration number, or search Cloud Forest, and the record comes up. In the same Bengaluru market, Amberstone Vectra helps frame how another project presents scale, location logic, and the trade-offs a household should resolve before shortlisting.

Two further points about the registration are worth stating before the detail, because they are the parts a buyer can actually enforce.

The proposed completion date is 31 October 2029. It was set when the registration was granted and it has never moved. There is no statutory extension against this project, no pandemic-era extension, and no subsequent extension of any kind. Nor has the sanctioned plan been modified since registration. A promoter who has neither rescheduled nor redesigned is not a guarantee of anything, but it is a materially different starting position from one who has done either, and both facts are visible on the register if they ever change.

The complaint count against this project is zero.

The registration in detail

FieldValue
Registered project nameCloud Forest
Marketing nameAlembic Cloud Forest
Registration numberPRM/KA/RERA/1251/446/PR/250625/007869
Registering authorityKarnataka Real Estate Regulatory Authority
PromoterShreno Limited
Promoter CINU26100GJ1944PLC000345
Project typeResidential apartments
Current statusUnder construction
Proposed completion31 October 2029
Extensions grantedNone
Plan modificationsNone
Complaints on this project0
Registered addressSurvey Numbers 20, 21, 22, 23, 24/1-3, 25/1-3 and 26/1, Pattandur Agrahara Village, K R Puram Hobli, Bengaluru East taluk, Bengaluru Urban district, 560066
Registered coordinates12.986254, 77.75782

One field on the record misleads people, and it is worth naming so that it stops doing so. A registration-time classification field still describes the project as a new launch. That is a snapshot of how the project was categorised when the registration was granted; it is not a statement about the project today. The project is under construction, it was 31% complete at 15 July 2026, and more than half its homes are sold.

Verify all of it at rera.karnataka.gov.in. Search the registration number. Confirm the registered name, the promoter, and the 31 October 2029 completion date for yourself, and do it before a booking amount changes hands rather than after.

The promoter - Shreno Limited, and where the Alembic brand fits

The promoter named on the registration is Shreno Limited, CIN U26100GJ1944PLC000345. That is the company bound to deliver this project, the company your agreement for sale will be with, and the company against which any statutory remedy would run.

Shreno Limited is an Alembic group company with a long history under a different name: it was formerly Alembic Glass Industries Limited, and it was renamed Shreno Limited in 2006. It is not a special-purpose vehicle incorporated for this project — a distinction that matters, because a thinly capitalised project company carrying the obligation while an established group carries the brand is a common arrangement and a materially weaker one for a buyer. Within the group, Alembic Limited and Shreno Limited share a common holding company, Nirayu, and Shreno Limited is an associate of Alembic Limited.

The project is marketed under the Alembic Real Estate name. Alembic Real Estate is a group-level brand, not a single legal entity, and it is not the promoter of this project. The practical consequence is simple and it is the reason this section exists at all: any assurance offered to you about the strength of "Alembic" should be tested by asking which company is giving it, and whether that company appears on the registration. For Cloud Forest, one company does, and it is Shreno Limited.

Shreno Limited holds one other Karnataka registration and has one Bengaluru delivery: Alembic Urban Forest, registered as PRM/KA/RERA/1251/446/PR/171031/001137 and approved on 31 October 2017. It stands adjacent to this site. Two complaints are recorded against the promoter in Karnataka, both against Urban Forest, both filed in July 2019, both concerning refunds on cancelled flats, and both disposed. None is recorded against Cloud Forest.

Land and title - owned outright, with no joint development

Shreno Limited owns 100% of the land, across every survey number in the registration. There is no joint-development agreement, no landowner share of the built area, and no co-promoter.

For a buyer, this is one of the more consequential lines in the whole record, and it is usually skimmed past. In a joint-development structure, part of the finished project belongs to a landowner who is not the promoter you contracted with, the split of units and revenues between them is a private agreement you generally cannot see, and a dispute between the two parties can stall a project that has nothing wrong with it technically. None of that applies here. A single company owns the land, is registered as the promoter, and carries the whole obligation.

The registration also declares no litigation on the land, on the khata or on the property. Together with sole ownership, that is a clean title position on the public record — which is not a substitute for your own advocate's title search, but is a good sign before you commission one.

The parcel sits between two roads. Its western boundary is Whitefield-Hoskote Road and its eastern boundary is A B Vajapayee Road, with the Kadugodi village boundary to the north and survey numbers 26/2, 26/3, 27 and 28 of Pattandur Agrahara to the south. Those four boundaries are the most reliable description of the site's extent available, and they are worth reading against the survey numbers in your sale deed.

The registered technical specification

Everything below is what the promoter has registered as the specification of the project. The three towers do not vary: the building form is one design repeated three times.

SpecificationValue
Total land area37,945 sq m, or about 9.38 acres
Open area29,511 sq m
Covered area8,433 sq m
Towers3 - Towers A, B and C
Homes per tower266
Total homes798
Unit bifurcation2 BHK 240, 3 BHK 348, 3.5 BHK 210
Floors per tower34 as registered
Super-structure slabs per tower35
Basement levels0
Tower height105.7 m
Covered parking1,041 lots
Open parking24 lots
Parking lots per tower266

Four of those lines repay a second look.

Nothing is below ground. The specification registers no basement level. All 1,041 covered parking lots and all 24 open lots therefore sit within the registered covered area of 8,433 sq m and the site's above-ground provision, which is an unusual arrangement for a project of this height and worth understanding on the drawings before you choose a floor.

Parking is allotted, not sold separately. Each tower is registered with 266 parking lots against 266 homes, and the registered unit schedule allots one lot to every apartment on every row. The totals corroborate it: 1,041 covered lots against 798 homes is more provision than one-per-home requires. Confirm that your specific lot is named in your agreement for sale.

The site is mostly open ground. 29,511 sq m of the 37,945 sq m parcel is registered as open area against 8,433 sq m covered. Three towers at 105.7 metres is the trade: the plan takes its density in height, and what it buys is ground.

The three-bedroom home dominates. 348 of the 798 homes are three-bedroom, against 240 two-bedroom and 210 three-and-a-half-bedroom. The project is built around one product, and the depth of the market for that product is the single biggest determinant of how the remaining inventory will move.

On areas, one clarification prevents a common error. The developer publishes apartment sizes of 936, 989, 1,230, 1,339 and 1,471 sq ft under a heading that reads carpet area. Those figures are the RERA carpet area plus the exclusive common area allotted to the apartment, which is the balcony and the utility. The RERA carpet areas themselves are 842, 898, 1,095, 1,197 and 1,320 sq ft, and it is the carpet figure that is legally binding and that will appear in your agreement for sale. Read it there, on the specific unit, and do the comparison arithmetic yourself.

Where the build and the sales stand

Alembic Cloud Forest is under construction. The promoter's reported completion at 15 July 2026 was 31%.

Reporting dateCompletionBookings
15 January 202616%Not reported here
15 April 202625%Not reported here
15 July 202631%434 of 798, with 364 available

Three consecutive quarters moving 16%, 25%, 31% is the useful part of that table — a project advancing at a consistent rate rather than in a single reported jump, on a timeline with more than three years left to run. Read a completion percentage as a measure of progress against the project's certified estimate rather than as a count of floors standing, and read it alongside the per-tower figures, which at 15 July 2026 were Tower A 11%, Tower B 16% and Tower C 13%. The three towers are not advancing in step; if handover sequence matters to you, ask which tower is scheduled to finish first and get the answer in writing.

The sales position at the same date was 434 of 798 homes booked, leaving 364 available. That is about 54% of the project committed against 31% built — buyers are running ahead of the concrete, and the remaining choice of tower, floor and facing is narrowing while the structure is still rising.

Every figure in this section is quarterly. They were roughly nine weeks old at the date of this page, and the next reporting date will move all of them. Treat them as the most recent established position rather than as live stock, and ask for current availability before each decision.

Financial standing

ItemPosition
Total project cost₹881.96 Cr
Land cost₹322.17 Cr
Development cost₹559.79 Cr
Borrowings declaredNone
Mortgage on the projectNone
Litigation on land, khata or propertyNone
Complaints on this project0

A declaration of no borrowings and no mortgage on a project costed at ₹881.96 Cr is the strongest single fact in this record, and it is worth being precise about what it means. It means the promoter has not pledged the project or the land as security for debt, so there is no lender with a charge over the property standing between a buyer and a clear title, and no debt-service burden competing with construction spending for the same rupees. It does not mean the project cannot be funded by debt in future, and it is not a rating of the promoter's overall balance sheet. It is a declaration about this project, made on the public record, and it can be re-checked there.

The cost split is the other useful line: ₹322.17 Cr of land against ₹559.79 Cr of development. Land accounts for a little over a third of the total, which is the shape you would expect where the promoter already owned the parcel outright rather than assembling it at current market value against a construction programme.

On certification, the substantive point is what was verified rather than what a group is worth. Shreno Limited filed certificates from its chartered accountant, from its architect and from its engineer with the registration application, together with three years of audited accounts. Those are project-specific attestations by named professionals who carry their own liability for them, and they are a more reliable comfort than any statement about the financial scale of the wider group — because the wider group is not the entity that owes you an apartment.

The timeline

DateMilestone
15 January 202616% complete
15 April 202625% complete
15 July 202631% complete; 434 of 798 homes booked, 364 available
16 September 2026Date of this page; most recent established position is 15 July 2026
31 October 2029Proposed completion, as registered and never revised

Between the most recent reported position and the proposed completion date lie a little over three years and roughly sixty-nine percentage points of construction. That is the exposure a buyer is taking on, and it is the reason the quarterly reporting matters: the mechanism that would change the completion date — a revision or an extension — becomes visible on the register at the moment it happens. Check it there before each payment milestone rather than relying on what you were told at booking.

What this overview does not establish

Three things a buyer will want are not settled here, and saying so is more useful than filling the gap.

The clubhouse. The registered amenity schedule declares no club house and no community hall, while declaring a party hall of 84 sq m, indoor sports of 470 sq m, outdoor sports of 1,175 sq m, a swimming pool of 310 sq m, parks of 645 sq m, a gymnasium and CCTV. The developer's own material promises an exclusive clubhouse. Both positions are on the record, they cannot both be describing the same building, and this page cannot resolve which governs. No clubhouse area is established by any source, so any size quoted to you is unverified until you see it on a drawing. If it is part of why you are buying, get it named, sized and dated in the agreement for sale.

The blocks beyond the registration. The developer's master plan shows two further blocks, D and E. Neither is registered with Karnataka RERA as at September 2026, and no launch date or unit count has been published. Nothing in them is covered by the registration above.

Price beyond the entry point. The developer publishes a starting price of ₹2.10 Cr for the 936 sq ft 2 BHK and nothing beyond it. No price is published for the 3 BHK, the 3 BHK Large or the 3.5 BHK, and no all-in cost sheet is public. Whether the starting figure is a base price or carries floor rise, preferential location charges, parking, club membership, corpus or statutory charges is not disclosed, and on a purchase in this bracket those items are not a rounding error.

Before you book

Verify PRM/KA/RERA/1251/446/PR/250625/007869 at rera.karnataka.gov.in and confirm the registered name Cloud Forest, the promoter Shreno Limited, and the 31 October 2029 completion date for yourself. Ask for the current booking position by tower, floor and facing rather than relying on the 15 July 2026 figures above. Ask for a line-itemised cost sheet in writing for the specific unit you are considering. Ask for the RERA carpet area of that unit and check it against the size you are being quoted. Get the clubhouse position in writing. Instruct your own advocate to run a title search against the survey numbers in the registered address. And walk Alembic Urban Forest next door, which the same promoter delivered, before you decide.

Alembic Cloud Forest FAQs

When is possession at Alembic Cloud Forest?

The completion date filed at registration is 31 October 2029. It has never been extended or modified, and no extension order stands against the project. Any other date you have been quoted for Alembic Cloud Forest, earlier or later, is not the filed one.

How far along is construction at Alembic Cloud Forest?

The promoter's filed completion figure was 31% at 15 July 2026, up from 25% at 15 April 2026 and 16% at 15 January 2026. Per tower at that date, Tower A stood at 11%, Tower B at 16% and Tower C at 13%. The tower figures are lower than the project figure because each tower is measured on its own structure while the project figure reflects overall progress across the site. The registration's own status field still carries the description it was given on the day the project was registered, which is registration-time metadata rather than a description of a project that is now a third built.

How many homes at Alembic Cloud Forest are still available?

434 of the 798 apartments were booked at 15 July 2026, leaving 364 available. Availability moves every quarter and varies by tower, floor and configuration, so ask for the current position on the specific stack you want rather than relying on a project-level number.

Where exactly is Alembic Cloud Forest?

At survey numbers 20, 21, 22, 23, 24/1 to 24/3, 25/1 to 25/3 and 26/1, Pattandur Agrahara Village, K R Puram Hobli, Bengaluru East, Bengaluru Urban - 560066. The coordinates filed with the registration are 12.986254, 77.75782. Some older listings, and some of the developer's own contact material, carry a different pincode for the wider estate - use 560066 for anything that has to match the registration, including the agreement.

What are the boundaries of the Alembic Cloud Forest site?

The registered boundaries are the Kadugodi Village boundary to the north, survey numbers 26/2, 26/3, 27 and 28 of Pattandur Agrahara to the south, A B Vajapayee Road to the east and Whitefield-Hoskote Road to the west.

Before you book

Ask for a line-itemised cost sheet against a unit number and an area basis, and check the registration yourself at rera.karnataka.gov.in.